St. John Engineering, LLC


543-07 Hwy 50 Sewer Force Main Project

BRIEF DESCRIPTION:
Install approximately 6,332 LF of 6" PVC sewer force main including bore with casing pipe, bore without casing pipe, sidewalk replacement, and erosion control measures.


Advertisement for Bids

Bid Form

Plan Holders






PLEASE NOTE:
There is NO CHARGE for documents that are downloaded from our website. Make sure the FREE items are checked below, click Add to Cart, and proceed to Checkout.

The cost for the Printed/Hard Copy is shown below. Select whether you want the item delivered or if you will pick it up, click Add to Cart, and proceed to Checkout.

If you wish to pick up a hard copy from our office, please place the order at least 2 hours prior to your arrival.

  • Bid Open Date & Time: 07/16/20 at 2:00 p.m.
  • Project County: Franklin

Please Choose:

Download





In Print - PICK UP




In Print - DELIVERED




Copyright © 2020 St. John Engineering, LLC. Powered by Zen Cart